Agency browse

Federal Energy Regulatory Commission

Agency prefix 1902 · FERC · Federal forms and information collections.

Forms
OMB NumberTitle
1902-0331 RD23-3 (CLO) FERC-725B(5), (Mandatory Reliability Standards, Critical Infrastructure Protection (CIP-003-9)
1902-0330 FERC-725B4, Mandatory Reliability Standards: Critical Infrastructure Reliability Standards CIP-004-7 and CIP-011-3 (RD21-6-000)
1902-0329 FERC-1002 (Customer Engagement Management Survey)
1902-0328 FERC-549E, Price Index Data Providers and Developers (PL20-3)
1902-0327 FERC-577A (and RM22-8 Proposed Rule): LNG Facilities: Environmental Review and Compliance
1902-0326 FERC-539A (for RM22-8 Proposed Rule): Gas Pipeline Certificate: Import/Export of LNG
1902-0325 FERC-1005, Credit Related Information Sharing Between RTOs/ISOs (RM22-13-000)
1902-0324 RD22-2 (DLO) Mandatory Reliability Standards for the Bulk-Power System TOP-001-6
1902-0323 FERC-1004, One-Time Reports on Extreme Weather Vulnerability Assessments (NOPR in RM22-16 & AD21-13)
1902-0322 FERC-725 (1C) RM22-12 (NOPR) Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards
1902-0321 FERC-725(1B), Final Rule in RM22-3, Procedures for Electric Reliability Standards
1902-0320 Request for a Medical Exception to the COVID-19 Vaccination Requirement
1902-0319 Safety of Water Power Projects and Project Works
1902-0318 One-time Re-filing under Docket PL19-4 of Page 700 of Form 6 (Annual Report of Oil Pipeline Companies)
1902-0317 FERC-919A,(Order of 8/2021 in RM16-17-000) Refinements to Policies & Procedures for Market Based Rates for Wholesale Sales of Electric Energy, Capacity & Ancillary Services by Public Utilities
1902-0316 FERC-556A, (NOPR in RM21-2 and RM20-20) Certification of Qualifying Facility (QF) Status for a Small Power Production or Cogeneration Facility
1902-0315 FERC-725B3, Order in RD19-3-000, (Mandatory Reliability Standards for Critical Infrastructure Protection [CIP] Reliability Standards)
1902-0314 FERC-6T, Annual Report of Oil Pipeline Companies, modifications to FERC-6 due to Final Rule in Docket No. RM19-12
1902-0313 FERC-3-QT, Quarterly Financial Report-Electric and Gas, modifications to FERC-3-Q due to Final Rule in Docket No. RM19-12
1902-0312 FERC-1-FT, Annual Report for Nonmajor Public Utilities and Licensees, Modifications to FERC-1-F due to Final Rule in Docket No. RM19-12
1902-0311 FERC-1T, Annual Report of Major Electric Utilities, Licensees and Others --Modifications to Form 1 due to Final Rule in Docket No. RM19-12
1902-0310 FERC-6-QT, modifications to FERC-6-Q, due to Final Rule in Docket No. RM19-12
1902-0309 FERC-505A,(NOPR in RM19-6-000) Small Hydropower Projects and Conduit Facilities including License/Relicense, Exemption, and Qualifying Conduit Facility Determination
1902-0308 FERC-60A, Annual Reports Of Centralized Service Cos., for NOPR in RM19-12
1902-0307 FERC-714A, Annual Electric Balancing Authority Area and Planning Area Report, for NOPR in RM19-12
1902-0306 FERC-549C1 (RM96-1-041 NOPR) Gas Pipeline Rates: Rate Change Non-Formal
1902-0305 FERC-545B (RM96-1-041 NOPR) Gas Pipeline Rates: Rate Change Non-Formal
1902-0304 FERC-725B2, (NOPR in RM17-13-000) Mandatory Reliability Standards for Critical Infrastructure Protection [CIP] Reliability Standards
1902-0303 FERC-516H, Electric Rate Schedules and Tariff Filings, Pro Forma Open Access Transmission Tariff (NOPR RM22-2)
1902-0302 FERC-501G, One-time Report on Rate Effect of the Tax Cuts and Jobs Act
1902-0301 FERC-725HH, RF Reliability Standards
1902-0300 FERC-725G6, (NOPR in RM16-22) Mandatory Reliability Standard PRC-027-1
1902-0299 FERC-599, (DOE NOPR in FERC Docket RM18-1) Grid Reliability and Resilience Pricing
1902-0298 FERC-725A(1C), Mandatory Reliability Standards for Bulk-Power System: Reliability Standard TOP-001-4 [Order in Docket RD17-4]
1902-0297 FERC-516F, (RM17-8-000 NOPR) Reform of Generator Interconnection Procedures and Agreements
1902-0296 FERC-516E, (NOPR in RM17-3-000) Fast-Start Pricing in Markets Operated by Regional Transmission Organizations and Independent System Operators
1902-0295 FERC-516G, Electric Rates Schedules and Tariff Filings
1902-0294 Affirmation in Support of Exemption from Affiliation Requirements
1902-0293 FERC-153, Generic Clearance for the Collection of Qualitative Feedback on Agency Service Delivery
1902-0292 FERC-725A(1B), Mandatory Reliability Standard: TOP-010-1
1902-0291 FERC-920(A), (NOPR in RM16-17) Electric Quarterly Report (EQR)
1902-0290 FERC-516E, (NOPR in RM05-5-031) Electric Rate Schedules and Tariff Filings
1902-0289 FERC-725(1A), (Final Rule in RM15-14-002) Revised Critical Infrastructure Protection Reliability Standards
1902-0288 FERC-516D, (Final Rule in Docket RM15-24) Electric Rate Schedules and Tariff Filings
1902-0287 FERC-516C, [RM16-5-000 NOPR] Offer Caps in Markets Operated by Regional Transmission Organizations and Independent System Operators
1902-0286 FERC-516B (NOPR in RM16-6-000) Electric Rates Schedules and Tariff Filings
1902-0285 FERC-725G3, (NOPR in RM15-8-000) Mandatory Reliability Standards (PRC-026-1 Reliability Standard)
1902-0284 FERC-725G1, Mandatory Reliability Standards for the Bulk-Power System: Reliability Standard PRC-004-6 (Protection System Misoperation Identification and Correction)
1902-0283 FERC-545A, (NOPR in RM96-1-038) Gas Pipeline Rates: Rate Change Non-Formal
1902-0282 FERC-725G4, Mandatory Reliability Standards: Reliability Standard PRC-010-2 (Undervoltage Load Shedding)
1902-0281 FERC-725G2, [NOPR in RM15-4] Reliability Standard: Disturbance Monitoring and Reporting Requirements
1902-0280 FERC-725P1, Mandatory Reliability Standards, PRC-005-6 Reliability Standard
1902-0279 FERC-725Y, Mandatory Reliability Standard PER–005–2 (Operations Personnel Training)
1902-0278 FERC-725X, Mandatory Reliability Standards: Voltage and Reactive (VAR) Standards
1902-0277 FERC-725V, (Renewal) Mandatory Reliability Standards: COM Reliability Standards
1902-0276 FERC-725Z, (RD14-4) Mandatory Reliability Standards: IRO Reliability Standards
1902-0275 FERC-725W, (RD14-4) Mandatory Reliability Standards: INT Reliability Standards
1902-0274 FERC-725U, Mandatory Reliability Standards: Reliability Standard CIP-014
1902-0273 FERC-725T (Order in RD13-12): Mandatory Reliability Standards for the Bulk-Power System: TRE Reliability Standards
1902-0272 FERC-725Q (NOPR in RM13-19 and RM14-3), Transmission Relay Loadability Mandatory Reliability Standards For the Bulk-Power System
1902-0271 FERC-733, Demand Response/Time-Based Rate Programs and Advanced Metering
1902-0270 FERC-725S, Mandatory Reliability Standards: Emergency Preparedness and Operations (EOP) Reliability Standards (Docket No. RD25-7-000)
1902-0269 FERC-725P (Proposed Rule in RM14-8), Mandatory Reliability Standards: Reliability Standard PRC-005
1902-0268 FERC-725R, RD25-5 Mandatory Reliability Standards: BAL Reliability Standards
1902-0267 FERC-604, Cash Management Agreements
1902-0266 FERC-717A (NOPR in RM05-5-022) Open Access Same-Time Information System and Standards for Business Practices & Communication Protocols
1902-0265 FERC-923, Communication of Operational Information between Natural Gas Pipelines and Electric Transmission Operators
1902-0264 FERC-725N, Mandatory Reliability Standards: TPL Reliability Standards
1902-0263 FERC-725M, Mandatory Reliability Standard: FAC-003-4, Vegetation Management
1902-0262 FERC-922, [AD19-16] Performance Metrics for ISOs, RTOs, and Utilities in Regions Outside ISOs and RTOs
1902-0261 FERC-725L (Order in RD16-1) Mandatory Reliability Standards for the Bulk-Power System: MOD Reliability Standards
1902-0260 FERC-725K, Mandatory Reliability Standards for the SERC Region (RD22-1-000)
1902-0259 FERC-725J, Definition of the Bulk Electric System (NOPR; RM12-6 & RM12-7)
1902-0258 FERC-725I, Mandatory Reliability Standards for the Northeast Power Coordinating Council
1902-0257 FERC-921, Ongoing Electronic Delivery of RTO/ISO Data
1902-0256 FERC-725H, [Final Rule in RM10-10] RFC Reliability Standards
1902-0255 FERC-920, (NOPR in RM15-2) Electric Quarterly Report (EQR)
1902-0254 FERC-740, Availability of E-Tag Information to Commission Staff
1902-0253 FERC-549D, [in RM09-2-001] Quarterly Transportation and Storage Report For Intrastate Natural Gas and Hinshaw Pipelines
1902-0252 Transmission Relay Loadability Mandatory Reliability Standard for the Bulk Power System
1902-0251 FERC-731, Demand Response/Time Based Rate Programs and Advanced Metering Survey
1902-0250 FERC-915, Public Utility Market-Based Rate Authorization Holders – Records Retention Requirements
1902-0249 Mandatory Reliability Standard for Nuclear Plant Interface Coordination
1902-0248 RM13-8 Proposed Rule: Mandatory Reliability Standards for Critical Infrastructure Protection
1902-0247 FERC-725D,(RM13-8 Final Rule) Facilities Design, Connections and Maintenance Reliability Standards
1902-0246 RM13-13 Final Rule (Mandatory Reliability Standards for the Western Electric Coordinating Council)
1902-0245 FERC-732, Electric Rate Schedules and Tariffs: Long-Term Firm Transmission Rights in Organized Electricity Markets
1902-0244 Mandatory Reliability Standards for the Bulk-Power System
1902-0243 Reporting of No Notice by Interstate Pipelines and Scheduled Volumes by Major Non-Interstate Natural Gas Pipelines
1902-0242 FERC-552, Annual Report of Natural Gas Transactions
1902-0241 Notification of Request for Federal Authorization
1902-0240 Report on Decision or Action on Request for Federal Authorization
1902-0239 Report of Transmission Investment Activity
1902-0238 FERC-729, Electric Transmission Facilities (Rehearing Docket No. RM22-7-000)
1902-0237 PURPA Section 210(m) Notification Requirements applicable to Cogeneration and Small Power Production Facilities, RM06-10-000 NOPR, Revised Regulations
1902-0236 Long-Term Firm Transmission Rights in Organized Electricity Markets RM06-8-000 NOPR
1902-0234 Market Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities
1902-0233 FERC-917/918: Electric Transmission Facilities (Rehearing Order 1920A)
1902-0231 FERC-914, Cogeneration and Small Power Production - Tariff Filings
1902-0226 Electric Rate Schedule Filings: RM05-5-000 Final Rule: Standards for Business Practices and Communication Protocols for Public Utilities
1902-0225 FERC-725, RM24-4 Nonsubstantive submission Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards
1902-0224 Unbundled Sales Service, Persons Holding Blanket Marteting Certificates (Gas Pipelines Rates: Title III and NGA Blanket Certificates (Non-Formal) RMO^ 14-000 NOPR
1902-0223 Public Utility Market-Bases Rate Authorization Holders (Electric Rate Schedule Filings) RM06-14-000 Final Rule
1902-0218 Notification of Holding Company Status
1902-0217 Waiver Notification of Holding Compay Status
1902-0216 Exemption Notification of Holding Company Status
1902-0215 RM09-21, NOPR; FERC-60 (“Annual Reports Of Centralized Serv. Cos.”), FERC–61 (“Narrative Desc. Of Serv. Co. Functions”), & FERC-555A (“Preserv. of Records for Serv. Cos. Subject to PUHCA2005)
1902-0214 Demand Responses and Time Based Rate Programs Survey, AD06-2-000
1902-0213 Advanced Metering Program Survey, Docket No. AD06-2-000
1902-0211 Electric Rate Schedule Filings; RMO05-5-000 NOPR: Stndards for Business Practices and Communication Protocols for Public Utilities
1902-0209 Buld Power System Operator Training Practices Survey
1902-0207 Vegetation Report, EL04-52-000
1902-0206 Quarterly Financial Report of Oil Pipeline Companies, Docket RM3-8-000 (Quarterly Financial Reporting and Revisions to the Annual Reports)
1902-0205 Quarterly Financial Report of Electric Utilities, Licenses, and Natural Gas Companies, Docket RM04-12-000 (Accounting and Financial Reporting for Public Utilities Including RTOs)
1902-0204 Energy Trade Data Survey, Docket PL03-3-000
1902-0203 Standardization of Small Generator Interconnection Agreements and Procedures, RM02-12-000 NOPR
1902-0197 Gas Pipeline Certificates: Critical Energy Infrastructure Information Data Request
1902-0196 Electric Rate Schedule Filings, RM02-14, Regulation of Cash Management Practices
1902-0194 Gas Pipeline Rates: Rate Change (Non-Formal) RM96-1-020 (Final Rule)
1902-0187 Reporting of Natural Gas Sales to the California Market
1902-0186 Reporting of Generation Unit Outages in New York
1902-0185 Reporting of Generating Unit Outages in California
1902-0184 California Natural Gas Marketer's Report
1902-0183 California Public Utility Sellers Weekly Report
1902-0181 Pilot Project For Electronic Filing of Documents
1902-0180 Rules of Practices and Procedures: Complaint Procedures
1902-0178 Survey of Sales and Purchase Information, Midwest Price Spike
1902-0177 Generic Clearance for Pretest/Pilot Studies, Questionnaires, Customer and Research Studies
1902-0175 Gas Pipeline Rates: Capacity Release/Pilot Program
1902-0174 Standards for Business Practices of Interstate Natural Gas Pipelines, RM96-1-024. (NOPR)
1902-0173 Standards for Business Practices and Communication Protocols for Public Utilities: RMO5-5-000 NOPR: Standards for Business Practices and Communication Protocols for Public Utilities
1902-0172 INQUIRY CONCERNING CONDITIONS IN PORTIONS OF THE EASTERN INTERCONNECTION -- EL94-23-000
1902-0171 FERC-715, Annual Transmission Planning and Evaluation Report
1902-0170 GOOD FAITH REQUEST FOR TRANSMISSION SERVICES AND RESPONSE BY TRANSMITTING UTILITY UNDER SECTIONS 211(A) AND 213(A) OF THE FEDERAL POWER ACT, AS AMENDED, AND ADDED BY ENERGY POLICY ACT
1902-0169 Gas Pipeline Rates: Capacity Reports and Index of Customers
1902-0168 APPLICATION FOR TRANSMISSION SERVICES UNDER SECTION 211 OF_THE FEDERAL POWER ACT, AS AMENDED, AND ADDED BY THE ENERGY_POLICY ACT OF 1992
1902-0167 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT
1902-0166 Self Certification for Entities Seeking Exempt Wholesale Generator Status or Foreign Utility Company Status
1902-0163 Customer Satisfaction Survey
1902-0162 GAS PIPELINES: TAKE-OR-PAY BUYOUT AND BUYDOWN COST SURVEY RE DOCKET NO. RM91-2-000, ET AL., MECHANISMS FOR PASSTHROUGH OF PIPELINE TAKE-OR-PAY AND BUYDOWN COSTS
1902-0161 GAS PIPELINE CERTIFICATES: ENVIRONMENTAL IMPACT STATEMENTS, RE NPRM IN DOCKET NO. RM92-13-000 RE REVISIONS TO REGS. GOVERNING SEC. 311 CONSTR. & REPLACEMENT FACILS., 08/03/92
1902-0160 GAS PIPELINE RATES: NGPA TITLE III TRANSACTIONS RE INTERIM RULE IN DOCKET NO. RM90-13-000, REVISIONS TO REGULATIONS GOVERNING TRANSPORTATION UNDER SEC. 311 OF THE NGPA OF 1978,
1902-0159 FERC-595, SURVEY OF PIPELINE RESPONSES TO EXTRAORDINARY DEMANDS OF DECEMBER 1989 (ONE-TIME SURVEY)
1902-0158 SURVEY OF INTERSTATE TRANSPORTATION ACTIVITY PURSUANT TO THE AUTHORITY OF SECTION 311 OF THE NATURAL GAS POLICY ACT
1902-0157 Standards of Conduct for Transmission Providers and Marketing Affiliates of Interstate Pipelines
1902-0155 GAS PIPELINE RATES: CERTIFICATED RATE FILINGS
1902-0154 Gas Pipelinw Rates: Rate Change (Non-Formal) RM96-1-015 Final Rule
1902-0153 Gas Pipeline Rates: Rate Change (Formal)
1902-0152 PURCHASED GAS ADJUSTMENT TRACKING (FORMAL)
1902-0149 FERC-593 NATURAL GAS CONTRACT SUMMARY INFORMATION
1902-0147 WELLHEAD PRICING: PRICING INVESTIGATIONS, (RM89-16, PROPOSAL IMPLEMENTING NATURAL GAS WELLHEAD DECONTROL ACT OF 1989)
1902-0145 Land Description, (Public Land States/Non-Public Land States (Rectangular or Non Rectangular Survey System Lands in Public Land States)
1902-0144 FERC-588, Emergency Natural Gas Transportation, Sale and Exchange Transactions,
1902-0143 INDEXES OF ESSENTIAL POWER SITE WITHDRAWALS
1902-0142 MONTHLY ALTERNATE FUEL/INCREMENTAL PRICE MONITORING REPORT
1902-0140 FERC-714, Annual Electric Balancing Authority Area and Planning Area Report
1902-0139 Monitoring Program
1902-0138 Reporting of Electric Shortages and Contingency Plans Underq PURPA 206
1902-0137 Interrogatory on Fuel and Energy Purchase Practices, IN79-6
1902-0136 HYDROELECTRIC FEES AND ANNUAL CHARGES
1902-0133 IMPLEMENTATION OF PURPA 210 - COGENERATION AND SMALL POWER PRODUCTION
1902-0132 OIL, GAS, AND ELECTRIC FEES AND ANNUAL CHARGES -- RM92-12
1902-0130 MANAGEMENT AND PROCUREMENT REPORTING AND RECORDKEEPNG REQUIREMENTS
1902-0129 TRACKING AND RECOVERY OF ALASKA NATURAL GAS TRANSPORTATION SYSTEM (ANGTS) CHARGES
1902-0128 GAS PIPELINE CERTIFICATES: ENVIRONMENTAL IMPACT STATEMENTS, RE FINAL RULE (ORDER NO. 555) IN DOCKET NO. RM90-1-000. REVISIONS TO REGS. GOVERNING AUTHORIZATIONS FOR CONSTRUCTION
1902-0127 POWER SYSTEM STATEMENT
1902-0126 NATURAL GAS PROCESSING PLANT OPERATOR INTERROGATORIES
1902-0124 RECORDKEEPING REQUIREMENTS FOR CERTAIN SALES OF NATURAL GAS, (RM89-16, PROPOSAL IMPLEMENTING NATURAL GAS WELLHEAD DECONTROL ACT OF 1989)
1902-0123 ELECTRIC UTILITY CONSERVATION PLANTS
1902-0121 PATENT CERTIFICATION FORM (INTERIM-FINAL)
1902-0120 PETITION FOR WAIVER OF PATENT RIGHTS AND RELATED REPORTING REQUIREMENTS
1902-0117 FUEL PURCHASE PRACTICES
1902-0116 Gas Pipeline Certificates: Hinshaw Exemptions
1902-0115 REQUIREMENTS OF LANDOWNER NOTIFICATION UNDER SEC. 14 OF THE ELECTRIC CONSUMERS PROTECTION ACT. RM87-32 -- FERC-505 APPLIC. FOR LICENSE FOR MAJ./MINOR HYDROPOWER PROJECTS, ...
1902-0114 REPORT OF UTILITY'S TWENTY LARGEST PURCHASERS
1902-0113 LOUISIANA FIRST USE TAX: REFUND PROCEDURES FOR PRIMARY AND SECONDARY PIPELINES
1902-0112 WELLHEAD CATEGORY DETERMINATION, (RM89-16, PROPOSAL IMPLEMENTING NATURAL GAS WELLHEAD DECONTROL ACT OF 1989)
1902-0111 REFUND OBLIGATIONS (PRODUCERS)(RM89-16, PROPOSAL IMPLEMENTING NATURAL GAS WELLHEAD DECONTROL ACT OF 1989)
1902-0110 INCREMENTAL PRICING REPORTS
1902-0109 FORMAT OF CONTRACT SUMMARY, APPLICATIONS FOR CERTIFICATES OF PUBLIC CONVENIENCE AND NECESSITY, FERC-558
1902-0108 FUEL PURCHASE ENVIRONMENTAL CONSTRAINTS
1902-0106 LICENSED HYDROPOWER PROJCECTS RECREATION REPORT
1902-0105 WINTER SUPPLY REPORT, MONITORING PROGRAM
1902-0103 UTILITY FUEL SUPPLY ASSOCIATES
1902-0102 UTILITY OWNED CONTROLLED COAL MINING
1902-0101 NATURAL GAS SUPPLY AND DELIVERY REPORT
1902-0099 REPORT OF INTERLOCKING DIRECTORATES
1902-0098 Records Retention Requirements, RM02-14-000 Interim Rule "Regulation of Case Management Practices"
1902-0097 ELECTRIC RATES - FORMAL INVESTIGATIONS (RATE LEVEL)
1902-0096 RM96-11 "Capacity Reservation Open Access Transmission Tariffs"
1902-0095 COMMISSION REVIEW OF ADJUSTMENT REQUEST DENIAL
1902-0094 COMMISSION REVIEW OF REMEDIAL ORDERS
1902-0093 FORMAL COMPLAINT
1902-0092 Financial Audits
1902-0091 OIL PIPELINE: INITIAL RATE
1902-0090 OIL PIPELINE: TARIFF, NON-FORMAL
1902-0089 Tariff Filings RM01-5-000 Electronic Tariff Filings
1902-0088 ELECTRIC LICENSE - FEDERAL RATES
1902-0087 Payments for Benefits from Headwater Improvements.
1902-0086 Title III and NGA Blanket Certificates (Non-Formal) RM01-5-000 Electronic Tariff Filings
1902-0085 STAFF ADJUSTMENTS UNDER NPGA SECTION 502(C) (REPEAL OF INCREMENTAL PRICING) RM87-28-000 ET. AL.
1902-0084 Gas Pipeline Rates: Refund Requirements
1902-0083 FERC-520, Application for Authority to Hold Interlocking Interlocking Directorate Positions
1902-0082 FERC-519, Application Under Federal Power Act Section 203
1902-0081 GAS PIPELINE RATE: RATE CHANGE-TRACKING (NON-FORMAL)
1902-0080 GAS PIPELINE RATE: RATE CHANGE-TRACKING (FORMAL)
1902-0079 Rules of Practice and Procedure: Declaration of Intention
1902-0078 ELECTRIC LICENSE - CHANGE LAND RIGHT
1902-0077 ELECTRIC RATES - FORMAL INVESTIGATIONS (OTHER THAN RATE LEVEL)
1902-0076 DATA REQUIREMENTS FOR EVALUATION OF FUEL ADJUSTMENT CLAUSES
1902-0075 SMALL POWER PRODUCTION AND COGENERATION FACILITIES APPLICATION AND NOTICE REQUIREMENTS
1902-0074 ELECTRIC LICENSE-TRANSMISSION LINE APPLICATION
1902-0073 FERC-512, [Final Rule in RM14-22] Preliminary Permit
1902-0072 GAS PIPELINE RATE: RATE CHANGE (NON-FORMAL)
1902-0071 GAS PIPELINE RATES: RATE CHANGE (FORMAL)
1902-0070 SUPPLEMENTAL FERC-542, GAS PIPELINE RATE: RATE CHANGE
1902-0069 FERC-511, Transfer of Hydropower License
1902-0068 FERC-510, Application for Surrender of Hydropower License
1902-0067 ELECTRIC LICENSE - AMENDEMENT (NEW CAPACITY)
1902-0066 GAS PIPELINE CERTIFICATES - CURTAILMENT PLAN, FERC-541
1902-0065 GAS PIPELINE CERTIFICATE: TRANSPORTATION AGREEMENT
1902-0064 ELECTRIC LICENSE - AMENDMENT TO LICENSE
1902-0063 MINOR HYDROELECTRIC LICENSE - CONSTRUCTED
1902-0062 Gas Pipelines Certificates; Import/Export Related, Regarding Applications for Authorization to Construct, Operate or Modify Facilities Used for Export or Import of Natural Gas
1902-0061 PIPELINE CERTIFICATE: INITIAL SERVICE
1902-0060 GAS PIPELINE RATES: RATE CHANGE (NON-FORMAL) FERC-545
1902-0059 MINOR HYDROELECTRIC LICENSE - RELICENSE
1902-0058 WATER POWER PROJECTS WITH MORE THAN 5 MW CAPACITY
1902-0057 GAS PRODUCER RATES: APPLICATION FOR PRODUCTION-RELATED COSTS (COMPRESSION ALLOWANCES AND PROTEST PROCEDURES UNDER NGPA SECTION 110)(RM89-16, PROPOSAL IMPLEMENTING THE ....
1902-0056 GAS PRODUCER RATE: SPECIAL RELIEF PETITION
1902-0055 GAS PRODUCER RATE: RATE FILING
1902-0054 MAJOR HYDROELECTRIC LICENSE - RELICENSE (NON-FORMAL)
1902-0053 MAJOR HYDROELECTRIC LICENSE - RELICENSE (FORMAL)
1902-0052 GAS PRODUCER CERTIFICATES: NEW SERVICE/AMENDMENTS (REGULATION OF NATURAL GAS PIPELINES AFTER PARTIAL WELLHEAD DECONTROL) (RM85-1-000, FINAL RULE)
1902-0051 GAS PRODUCER CERTIFICATION: ABANDONMENT TERMINATION (CEILING PRICES: OLD GAS PRICING STRUCTURE - RM86-3-000)
1902-0050 MAJOR HYDROELECTRIC LICENSE- NEW CAPACITY (NON-FORMAL)
1902-0049 MAJOR HYDROELECTRIC LICENSE - NEW CAPACITY (FORMAL)
1902-0048 MINOR HYDROELECTRIC LICENSE - NEW CAPACITY
1902-0047 GAS PRODUCERS CERTIFICATE: SMALL PRODUCER
1902-0046 GAS PIPELINE CERTIFICATE: CONSTRUCTION AND OPERATION/ TRANSPORTATION/EXCHANGE
1902-0045 GAS PIPELINE CERTIFICATE CONSTRUCTION AND OPTN/TRNSPTN/ EXCHANGE AND STORAGE (FORMAL)
1902-0044 APPLICATION TO ISSUE SECURITIES BY COMPETITIVE BIDS
1902-0043 Securities Authorization
1902-0042 RETAIL ELECTRIC COST OF SERVICE UNDER PURPA 133
1902-0041 INITIAL REPORT OF FIRST SALES OF NATURAL GAS UNDER SECTION 105 OF THE NATURAL GAS POLICY ACT, EXISTING INTRASTATE CONTRACTS
1902-0040 REPORT OF FIRST SALES OF NATURAL GAS UNDER SECTION 106(B) OF THE NATURAL GAS POLICY ACT, INTRASTATE ROLLOVER CONTRACTS
1902-0039 REPORT OF FIRST SALES OF NATURAL GAS UNDER SECTION 109 OF THE NATURAL GAS POLICY ACT, OTHER CATGORIES OF NATURAL GAS
1902-0038 FORM FERC-121, APPLICATION FOR DETERMINATION OF MAXIMUM LAWFUL PRICE UNDER THE NATURAL GAS POLICY ACT OF 1978
1902-0037 TOTAL GAS SUPPLY OF NATURAL GAS PIPELINE COMPANIES ANNUAL REPORT
1902-0036 QUESTIONNAIRE SCHEDULES FOR CONTINUING REVIEW OF RATE
1902-0035 CLASS I AND II SYSTEMS AND REQUESTED CLASS IV AND V SYSTEMS POWER SYSTEM STATEMENT
1902-0034 STEAM-ELECTRIC PLANT OPERATION AND DESIGN REPORT
1902-0033 MONTHLY POWER PLANT REPORT
1902-0032 NATURAL GAS PIPELINE MONTHLY REPORT
1902-0031 ELECTRIC UTILITY COMPANY MONTHLY STATEMENT
1902-0030 RM07-9-003 FERC-2A, Annual Report of Nonmajor Natural Gas Companies
1902-0029 FERC Form 1-F, Annual Report of NonMajor Public Utilities, Licensees, and Others,
1902-0028 FERC-2, [RM07-9-004] Annual Report of Major Natural Gas Companies
1902-0027 ANNUAL REPORT FOR IMPORTERS AND EXPORTERS OF NATURAL GAS, FPC FORM NO. 14
1902-0026 UNDERGROUND GAS STORAGE REPORT FPC FORM NO. 8
1902-0025 REPORT OF GAS SUPPLY AND REQUIREMENTS
1902-0024 Monthly Report of Cost and Quality of Fuels for Electric Plants
1902-0023 RETAIL ELECTRIC COST OF SERVICE REPORT UNDER $133 OF PURPA
1902-0022 FERC Form 6, [RM11-21, NOPR] Annual Report of Oil Pipeline Companies
1902-0021 Form 1, Annual Report of Major Public Utilities, Licensees and Others
1902-0020 APPLICATION FOR CERTIFICATION OF REFINERY CAPACITY
1902-0019 SERVICE LIFE DATA (RM85-11-000)
1902-0018 SUMMARY OF LAND AND RIGHTS-OF-WAY PROPERTY CHANGES - PIPELINE CARRIERS
1902-0017 SUMMARY OF ORIGINAL COST INVENTORY
1902-0016 INVENTORY OF LAND AND RIGHTS-OF-WAY
1902-0015 INVENTORY OF PROPERTY OTHER THAN LAND AND RIGHTS-OF-WAY
1902-0014 COST DATA FOR EQUIPMENT AND TANKS
1902-0013 COST DATA FOR PIPELINE CONSTRUCTION
1902-0012 QUARTERLY REPORT OF PIPE LINE COMPANIES
1902-0011 STATEMENT OF PROPERTY CHANGES OTHER THAN LAND AND RIGHTS-OF-WAY PIPELINE CARRIERS
1902-0010 SUMMARY OF CHANGES IN ORIGINAL COST AND TOTAL ORIGINAL COST AT END OF PERIOD-PIPELINE CARRIERS
1902-0009 SUMMARY OF COST REPRODUCTION NEW ANDCOST OF REPRODUCTION NEW LESS DEPRECIATION
1902-0008 RESERVE DEDICATION REPORT
1902-0007 REPORTING OF TEMPORARY EMERGENCY SALES AND DELIVERIES OF NATURAL GAS FOR RESALE IN INTERSTATE COMMERCE BY PERSONS WITH EXEMPTIONS UNDER THE NATURAL GAS ACT
1902-0006 APPLICATION FOR SMALL PRODUCER EXEMPTION, (RM89-16, PROPOSAL IMPLEMENTING NATURAL GAS WELLHEAD DECONTROL ACT OF 1989)
1902-0005 Pipeline Certificates: Annual Reports of System Flow Diagrams and System Capacity
1902-0004 REPORT ON SERVICE INTERRUPTIONS ON PIPELINE SYSTEMS
1902-0003 APPLICATION FOR ANNUAL OR BASIC VALUATION (TRANSFER OF OIL PIPELINE REGULATIONS)
1902-0002 REPORT OF EVENTS AFFECTING BULK POWER SUPPLY
1902-0001 LICENSED PROJECTS RECREATION REPORT