OMB control number

FERC-725, RM24-4 Nonsubstantive submission Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards

OMB 1902-0225 ยท FERC.

OMB 1902-0225

The FERC-725 contains the following information collection elements: Self-Assessment and ERO (Electric Reliability Organization) Application: The Commission requires the ERO to submit to FERC a performance assessment report every five years. The next assessment is due in 2025. Each Regional Entity submits a performance assessment report to the ERO. Submitting an application to become the ERO is also part of this collection. Reliability Assessments: 18 CFR 39.11 requires the ERO to assess the reliability and adequacy of the Bulk-Power System in North America. Subsequently, the ERO must report to the Commission on its findings. Regional entities perform similar assessments within individual regions. Currently the ERO submits to FERC three assessments each year: long term, winter, and summer. In addition, the North American Electric Reliability Corporation (NERC, the Commission-approved ERO) also submits various other assessments as needed. Reliability Standards Development: Under section 215 of the Federal Power Act (FPA), the ERO is charged with developing Reliability Standards. Regional Entities may also develop regional specific standards and have standard experts on staff to work with entities below the regional level. Reliability Compliance: Reliability Standards are mandatory and enforceable upon approval by the Commission. In addition to the specific information collection requirements contained in each standard (cleared under other information collections), there are general compliance, monitoring and enforcement information collection requirements imposed on applicable entities. Audits, spot checks, self-certifications, exception data submittals, violation reporting, and mitigation plan confirmation are included in this area. Stakeholder Survey: The ERO uses a stakeholder survey to solicit feedback from registered entities in preparation for its five-year self-performance assessment. The Commission assumes that the ERO will perform another survey prior to the 2025 self-assessment. Other Reporting: This category refers to all other reporting requirements imposed.

The latest form for FERC-725, RM24-4 Nonsubstantive submission Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards expires 2028-07-31 and can be found here.

Latest Forms, Documents, and Supporting Material
All Historical Document Collections
No material or nonsubstantive change to a currently approved collection 2026-03-17
Extension without change of a currently approved collection 2025-03-19
Approved without change
Revision of a currently approved collection 2023-11-02
Approved without change
Revision of a currently approved collection 2023-07-25
Approved without change
No material or nonsubstantive change to a currently approved collection 2022-11-25
Comment filed on proposed rule and continue
Revision of a currently approved collection 2022-06-27
Approved with change
Extension without change of a currently approved collection 2022-01-13
Comment filed on proposed rule and continue
Revision of a currently approved collection 2021-02-25
Approved without change
No material or nonsubstantive change to a currently approved collection 2019-09-18
Approved without change
Extension without change of a currently approved collection 2019-01-28
Approved without change
No material or nonsubstantive change to a currently approved collection 2018-08-10
Approved without change
No material or nonsubstantive change to a currently approved collection 2017-12-26
Approved without change
No material or nonsubstantive change to a currently approved collection 2016-07-12
Approved with change
Extension without change of a currently approved collection 2015-11-18
Comment filed on proposed rule and continue
Revision of a currently approved collection 2015-11-06
Approved without change
Revision of a currently approved collection 2015-11-05
Preapproved
No material or nonsubstantive change to a currently approved collection 2013-05-23
Comment filed on proposed rule and continue
No material or nonsubstantive change to a currently approved collection 2012-11-07
Approved with change
Extension without change of a currently approved collection 2012-07-10
Approved without change
Revision of a currently approved collection 2009-07-16
Withdrawn and continue
Extension without change of a currently approved collection 2009-05-07
Approved without change
New collection (Request for a new OMB Control Number) 2006-04-21
OMB Details

Registered Entities

Federal Enterprise Architecture: Energy - Energy Resource Management