In accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
12/31/2021
36 Months From Approved
12/31/2018
36
0
36
6,280
0
6,263
29,700
0
29,700
The New Source Performance Standards (NSPS) for Primary Emissions from Basic Oxygen Process Furnaces (Subpart N) apply to each basic oxygen process furnace (BOPF) in an iron and steel plant that commenced construction, modification, or reconstruction after the date of proposal. These standards were merged with Standards of Performance for Secondary Emissions from Basic Oxygen Process Steelmaking Facilities (Subpart Na). Subpart Na is applicable to any top blown BOPF, and hot metal transfer station or skimming stations used with bottom-blown or top-blown BOPF’s for which construction, reconstruction, or modification commenced after January 20, 1983. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 60, Subparts N and Na.
The increase in burden from the most recently approved ICR is due to an adjustment. Hours were added to approximate the time spent by each source each year to familiarize with the rule requirements, and the total hours were rounded to three significant digits, which resulted in a small increase in labor hours since the last renewal.
$9,710
No
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.