Ensure that current and requested annual cost burden reflect analysis in supporting statement on the I83 form, in the future.
Inventory as of this Action
Requested
Previously Approved
09/30/2007
09/30/2007
09/30/2004
50
0
45
3,650
0
3,285
188,000
0
182,000
FERC-512 is used by FERC toimplement the statutory provisions of sections 4(f), 5, and 7 of the Federal Power Act, 16 USC sections 797, 798, and 800. The purpose of obtaining preliminary permit is to maintain priority over the applications for a license for a hydropower facility while the applicant conducts surveys to prepare maps, plans, specifications and estimates; conducts engineering, economic and environmental feasibility studies; and making financial arrangements.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.