NESHAP for Primary Copper Smelters (40 CFR part 63, subpart QQQ) (Final Rule)
Revision of a currently approved collection
No
Regular
Approved without change
03/13/2026
02/28/2025
In accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
03/31/2029
36 Months From Approved
03/31/2026
42
0
26
6,491
0
6,300
301,898
0
5,480
In this action, EPA is finalizing amendments that require electronic reporting of results of performance tests and CEMS performance evaluations, fugitive dust plans and notification of compliance reports, remove the requirement to submit certain information related to the malfunction exemption, and impose other rule revisions that affect reporting and recordkeeping requirements for primary copper smelting facilities, such as requirements to submit new performance test reports and to maintain new operating parameter records to demonstrate compliance with new standards. This information will be collected to assure compliance with 40 CFR part 63, subpart QQQ.
This ICR is prepared for final amendments to the NESHAP for Primary Copper Smelting (40 CFR, Part 63, Subpart QQQ). These final amendments include: (1) adjust references to the Part 63 General Provisions (40 CFR, Part 63, Subpart A) and revise provisions in the NESHAP (40 CFR Part 63, Subpart QQQ) to remove the SSM exemption and SSM plan requirement; (2) add electronic submittal of notifications of compliance and performance test reports; (3) add emission limits for particulate matter (PM), as surrogate for HAP metals, for anode refining furnace point source emissions; (4) add emission limits for PM, a surrogate for HAP metals, for new converters; (5) add emission limits for PM, as surrogate for HAP metals, as well as a lead limit for process fugitive emissions from anode furnaces, smelting furnaces and converters; (6) add limits for mercury emissions from the combination of point source emissions from converters, smelting furnaces, and anode refining (7) add emission limits for benzene, toluene, chlorine, hydrogen chloride, polycyclic aromatic hydrocarbons, dioxins/furans from the combination of point source emissions from converters, smelting furnaces, and anode refining (8) add emission limit for PM, a surrogate for HAP metals, for the combination of the Hoboken converter process fugitive capture system; (9) add design standards for the combination of Peirce Smith converters, Inco flash furnaces and anode refining point sources; and (9) add work practices for the use of a bypass stack. Where applicable, adjustments for these final amendments are reflected in Tables 1 and 2 of this ICR.
There are currently two facilities subject to subpart QQQ. The labor rates that were used reflect rates for 2022 instead of 2018. The burden estimate for familiarizing with regulatory requirements was increased to reflect the time it would take industry to review the final amendments. Additional performance testing is required under the final rule. Many of the other burden items are one-time requirements that would apply only to new respondents and there no new respondents are estimated over the 3-year period of this ICR. There is no additional burden associated with electronic reporting beyond reading the rule and any technical memoranda. Any burden associated with developing SSM plans and submitting periodic SSM reports were removed.
$23,900
No
No
No
No
No
No
No
Muntasir Ali 919 541-0833
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
02/28/2025
Something went wrong when downloading this file. If you have any questions, please send an email to risc@gsa.gov.