NESHAP for Lime Manufacturing (40 CFR Part 63, Subpart AAAAA) (Proposed Rule)
Revision of a currently approved collection
No
Regular
07/24/2024
Requested
Previously Approved
36 Months From Approved
02/28/2025
145
144
8,392
9,688
335,000
684,000
he National Emission Standards for Hazardous Air Pollutants (NESHAP) for Lime Manufacturing Plants (40 CR Part 63, Subpart AAAAA) were proposed on December 20, 2002; promulgated on January 5, 2004; and amended on April 20, 2006. These regulations apply to existing facilities and new facilities that either emit or has the potential to emit any single hazardous air pollutant (HAP) at a rate of 9.07 megagrams (10 tons) or more per year or any combination of HAP at a rate of 22.68 megagrams (25 tons) or more per year from all emission sources at the plant site. This subpart covers lime kilns, their associated coolers, and processed stone handling (PSH) operation systems located at a lime manufacturing plant that is a major source. New facilities include those that commenced construction, modification or reconstruction after the date of proposal. Final amendments to the NESHAP for Lime Manufacturing were promulgated on July 24, 2020, based on the results of a residual risk and technology review of the regulation (85 FR 44960). The information collection herein represents proposed rulemaking to add emission standards for four previously unregulated pollutants.
In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP. Any owner/operator subject to the provisions of the NESHAP for Lime Manufacturing shall maintain a file containing these documents and retain the file for at least five years following the generation date of such maintenance reports and records. All reports are sent to the delegated state or local authority. If there is no such delegated authority, the reports are sent directly to the U.S. Environmental Protection Agency's (EPA) regional offices.
The change in burden from the current OMB Inventory of Approved Burdens represents the burden associated with the proposed rule amendments to the Lime Manufacturing Plant NESHAP.
$59,700
No
No
No
No
No
No
No
Brian Storey 919 541-1103 storey.brian@epa.gov
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.