Document
DD Form 250-1 Tanker/Barge Material Inspection and Receiving Report
ICR 202312-0704-003 · OMB 0704-0248 · Object 138108100.
Document [pdf]
Download: pdf | txt
TANKER/BARGE MATERIAL INSPECTION AND RECEIVING REPORT Form Approved OMB No. 0704-0248 The public reporting burden for this collection of information is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0248). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION. SEND THIS FORM IN ACCORDANCE WITH THE INSTRUCTIONS CONTAINED IN THE DFARS, APPENDIX F-401. 1. TANKER/BARGE 2. INSPECTION OFFICE LOADING REPORT 3. REPORT NUMBER DISCHARGE REPORT 4. AGENCY PLACING ORDER ON SHIPPER, CITY, STATE AND/OR LOCAL ADDRESS (Loading) 5. DEPARTMENT 6. PRIME CONTRACT OR P.O. NUMBER 7. NAME OF PRIME CONTRACTOR, CITY, STATE AND/OR LOCAL ADDRESS (Loading) 8. STORAGE CONTRACT 9. TERMINAL OR REFINERY SHIPPED FROM, CITY, STATE AND/OR LOCAL ADDRESS (Loading) 10. ORDER NUMBER ON SUPPLIER 11. SHIPPED TO (Receiving Activity, City, State and/or Local Address) 12. B/L NUMBER 13. REQN. OR REQUEST NO. 14. CARGO NUMBER 15. VESSEL 16. DRAFT ARRIVAL 17. DRAFT SAILING FORE 18. PREVIOUS TWO CARGOES AFT FORE AFT 19. PRIOR INSPECTION FIRST LAST 21. APPROPRIATION (Loading) 20. CONDITION OF SHORE PIPELINE 23. PRODUCT 25. 22. CONTRACT ITEM NO. 24. SPECIFICATIONS STATEMENT OF QUANTITY LOADED DISCHARGED LOSS/GAIN PER CENT BARRELS (42 Gals) (Net) GALLONS (Net) TONS (Long) 26. STATEMENT OF QUALITY TESTS 27. SPECIFICATION LIMITS TIME STATEMENT DATE NOTICE OF READINESS TO LOAD DISCHARGE TEST RESULTS TIME 28. REMARKS (Note in detail cause of delays such as repairs, breakdown, slow operation, stoppages, etc.) VESSEL ARRIVED IN ROADS MOORED ALONGSIDE STARTED BALLAST DISCHARGE FINISHED BALLAST DISCHARGE INSPECTED AND READY TO LOAD DISCHARGE CARGO HOSES CONNECTED COMMENCED LOADING DISCHARGE STOPPED LOADING DISCHARGING RESUMED LOADING DISCHARGING FINISHED LOADING DISCHARGING CARGO HOSES REMOVED VESSEL RELEASED BY INSPECTOR 29. COMPANY OR RECEIVING TERMINAL COMMENCED BUNKERING FINISHED BUNKERING (Signature) VESSEL LEFT BERTH (Actual/Estimated) 30. I CERTIFY THAT THE CARGO WAS INSPECTED, ACCEPTED AND LOADED/DISCHARGED AS INDICATED HEREON. (Date) DD Form 250-1, NOV 92 31. I HEREBY CERTIFY THAT THIS TIME STATEMENT IS CORRECT. (Signature of Authorized Government Representative) Previous edition may be used. (Master or Agent) Reset Adobe Professional 7.0
| File Type | application/pdf |
| File Title | DD Form 250-1, Tanker/Barge Material Inspection and Receiving Report, November 1992 |
| Author | WHS/ESD/IMD |
| File Modified | 2007-06-05 |
| File Created | 2004-03-02 |