Construction Requirements; Interim Reports, Sections 27.14(g)-(l)
Extension without change of a currently approved collection
No
Delegated
Approved without change
09/23/2020
09/23/2020
Inventory as of this Action
Requested
Previously Approved
09/30/2023
36 Months From Approved
11/30/2020
168
0
1,118
2,265
0
11,260
214,950
0
1,893,700
On October 29, 2013, the Commission issued a Report and Order and Order of Proposed Modification in WT Docket No. 12-69 and WT Docket No. 12-332, FCC 13-136 (700 MHz Interoperability Order), in which it revised certain technical rules and extended or waived construction deadlines for certain licenses in order to resolve issues resulting from the lack of interoperability in the Lower 700 MHz Band. The Report and Order did not revise any of the information collection requirements that are contained in this collection. It simply waived or revised the dates on which the information collection requirements are required.
Interim reports are used by the Commission to determine the progress made by licensees to meet specific performance requirements, and the manner in which their spectrum is being utilized, and to determine whether licensees have complied with the Commission's performance benchmarks. The Commission will also use the information to evaluate whether further assessment of the rules or other actions are necessary in the event spectrum is being stockpiled or warehoused, or if it is otherwise not being made available despite existing demand.
There are no program changes to this collection. There are adjustments to this collection as a result of the re-evaluation of the figures for this collection. There are as follows: -950 to the number of respondents, -950 to the annual number of responses, -8,995 to the annual burden hours and -$1,678,750 to the annual cost.
$7,876
No
No
No
No
No
No
No
Linda Chang 202 418-1339 linda.chang@fcc.gov
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;