n accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
05/31/2022
36 Months From Approved
05/31/2019
124,000
0
124,090
287,000
0
292,050
0
0
0
The National Emission Standards for Hazardous Air Pollutants (NESHAP) for the regulations published at 40 CFR Part 61, Subpart M were proposed on January 10, 1989, promulgated on November 20, 1990 (55 FR 48414), and amended on July 20, 2004 (69 FR 43324). These regulations apply to demolition and renovation of facilities; the disposal of asbestos waste; asbestos milling, manufacturing and fabricating; the use of asbestos on roadways; asbestos waste converting facilities; and the use of asbestos insulation and sprayed-on materials. This information is being collected to assure compliance with 40 CFR part 61, subpart M.
In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.
There is a decrease in the total estimated burden as currently identified in the OMB Inventory of Approved Burdens. The change is due to the addition of electronic reporting. The result is an overall reduction in burden by 5,050 hours per year. We expect there to be an initial burden for respondents to learn the new electronic reporting system, and a reduced burden over time (less 6,330 hours per year) to submit notifications electronically (as compared to submitting them through the U.S. mail, the currently required process). We expect the regulated community and states in Region 3 to adopt electronic submission of 40 CFR 61.145(b) notifications gradually, with other Regions and their regulated community to follow. Therefore, although we have conservatively estimated that approximately 10 percent of the respondents use electronic reporting in this renewal, we expect the number of respondents using electronic reporting to increase in the coming years, which will result in additional burden reductions over time.
We have updated the respondent and Agency burdens to include an AWP for ACPRPs. Burden associated with the CTPS AWP is due to the collection and retention of samples and the requirement to report malfunctions (101 hours per year). Other changes, such as recordkeeping and notations to the utility records (in the case of ACPRP using the AWP) or notation to the deed are unchanged. Industry sources estimated there would eventually be 100 (pipe replacement) companies that would use the close tolerance horizontal directional drilling method over the years with the majority of the (A/C pipe) footage being installed by 25 companies.
Finally, we have updated the number of respondents to accurately reflect industry growth from the prior renewal (1,180 hours per year), and updated the respondent and Agency labor rates, which are referenced from the Bureau of Labor Statistics and OPM, respectively. The overall result is a decrease in burden, however, the revised labor rates and industry growth result in an increase in respondent labor costs.
$1,770,000
No
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.