In accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
04/30/2022
36 Months From Approved
04/30/2019
22
0
22
306
0
343
3,040
0
3,040
The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Refractory Products Manufacturing (40 CFR Part 63, Subpart SSSSS) were proposed on June 20, 2002, and promulgated on April 16, 2003. These regulations apply to each refractory products manufacturing facility which produces refractory bricks, refractory shapes, monolithics, kiln furniture, crucibles, and other materials used as linings for boilers, kilns, and other processing units and equipment where extreme temperature, corrosions, and abrasion would destroy other materials. These regulations apply to existing facilities and new facilities that manufacture refractory products and use organic hazardous air pollutant (HAP), chromium refractory, and clay refractory products. New facilities include those that commenced construction, modification or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 63, Subpart SSSSS.
In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.
The decrease in burden from the most-recently approved ICR is not due to any program changes. The decrease in burden is due to correction of a mathematical error in the prior ICR, which inadvertently double-counted the burden for respondents to read and re-familiarize themselves with the rule requirements annually. This ICR updates the burden estimate for this requirement from 4.5 hours to 0.5 hours per respondent. There was no change in the capital/startup and O&M costs.
$8,530
No
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.