n accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
12/31/2021
36 Months From Approved
12/31/2018
5,893
0
5,158
24,999
0
19,000
0
0
0
The New Source Performance Standards (NSPS) for Hot Mix Asphalt Facilities (40 CFR Part 60, Subpart I) apply to hot mix asphalt facilities that commenced construction or modification after June 11, 1973. A hot mix asphalt facility is comprised only of any combination of the following: dryers; systems for screening, handling, storing, and weighing hot aggregate; systems for loading, transferring, and storing mineral filler; systems for mixing hot mix asphalt; and the loading, transfer, and storage systems associated with emission control systems. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 60, Subpart I.
There is an adjustment increase in the estimated burden and number of responses as currently identified in the OMB Inventory of Approved Burdens. The increase is not due to any program changes. The change in burden occurred because the number of respondents, subject to these standards, has increased since the last ICR renewal period. In addition, this ICR assumes all existing respondents will have to familiarize with the regulatory requirements each year.
$196,000
No
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.