03/31/2019
271
0
463
32,800
0
29,116
1,350,000
0
4,732,368
The Emission Guidelines for Sewage Sludge Incinerators (SSI) for Sewage Sludge Incinerators (40 CFR Part 60, Subpart MMMM) apply to the administrators of air quality programs in a state or U.S. protectorate with one or more SSI units that commenced construction either on or before the date of proposal. States may choose to incorporate the model rule text directly in their state plan. If a State does not develop, adopt, and submit an approvable State plan, the EPA must develop a Federal plan to implement the emission guidelines. These regulations do not directly apply to SSI unit owners and operators. However, SSI unit owners and operators must comply with the state plan to implement the emission guidelines contained in this Subpart. These standards only affect existing units constructed on or before October 14, 2010; therefore, no new units will become subject to these same standards. This information is being collected to assure compliance with 40 CFR Part 60, Subpart MMMM.
In general, all emission guidelines require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to emission guidelines.
US Code:
42 USC 7429
Name of Law: Solid Waste Combustion
US Code:
42 USC 7411
Name of Law: Standards of performance for new stationary sources
There is an adjustment increase in the labor hours and costs as compared to the previously approved ICR. The increase is not due to any program changes. The increase in labor burden and costs occurred for two reasons: 1) this ICR assumes all respondents will have to familiarize with the regulatory requirements each year; and 2) this ICR fixes an error in the previous ICR which did not include recordkeeping burden for operating parameters. However, there is an adjustment decrease in the total capital and O&M costs and number of responses as compared to the previous ICR. The decrease occurred for two reasons: 1) the total number of SSI units has decreased since the previous ICR; and 2) this ICR fixes an error in the previous ICR to correctly reflect the assumption that all facilities will meet the requirements to perform testing on a reduced schedule (every three years) rather than conduct annual testing.
$157,000
No
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
08/23/2018
Something went wrong when downloading this file. If you have any questions, please send an email to risc@gsa.gov.