NSPS for Crude Oil and Natural Gas Facilities for Construction, Modification, or Reconstruction Commenced After September 18, 2015 (40 CFR part 60, subpart OOOOa) (Proposed Rule)
NSPS for Crude Oil and Natural Gas Facilities for Construction, Modification, or Reconstruction Commenced After September 18, 2015 (40 CFR part 60, subpart OOOOa) (Proposed Rule)
New collection (Request for a new OMB Control Number)
OMB files this comment in accordance with 5 CFR 1320.11(c) of the Paperwork Reduction Act and is withholding approval of this collection at this time. This OMB action is not an approval to conduct or sponsor an information collection under the Paperwork Reduction Act of 1995. This action has no effect on any current approvals.
Inventory as of this Action
Requested
Previously Approved
36 Months From Approved
0
0
0
0
0
0
0
0
0
This ICR covers information collection requirements in the New Source Performance Standards (NSPS) for Crude Oil and Natural Gas Facilities (40 CFR part 60, subpart OOOOa), which includes: standards for GHG emissions (in the form of limitations on methane) from certain facilities that are covered by current VOC standards in the oil and natural gas source category, and standards for GHG and VOC emissions from facilities across the source category that are currently unregulated, including hydraulically fractured oil well completions; fugitive emissions from well sites and compressor stations; pneumatic pumps; and centrifugal compressors, reciprocating compressors and pneumatic controllers in the transmission and storage segment. In general, all NSPS standards require initial notifications, performance tests, and periodic reports. Owners or operators are also required to maintain records of calculations and compliance determinations. These notifications, reports, and records are essential in determining compliance, and are required of all owners and operators of affected facilities subject to NSPS. The information collected will be used by the EPA and delegated state and local agencies to determine the compliance status of affected facilities subject to the rule.
The burden in this ICR covers information collection requirements in the New Source Performance Standards (NSPS) for Crude Oil and Natural Gas Facilities (40 CFR part 60, subpart OOOOa).
$532,526
No
No
No
No
No
No
Uncollected
Bruce Moore 919 541-5460 moore.bruce@epa.gov
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.