In accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
08/31/2018
36 Months From Approved
08/31/2015
40
0
40
13,165
0
13,165
0
0
0
This rule applies to affected facilities at bulk gasoline terminals which have a throughput greater than 75,700 liters per day, delivering liquid product into gasoline tank trucks. The affected facility includes the loading arms, pumps, meters, shutoff valves, relief valves, and other piping and valves necessary to fill delivery tank trucks. New facilities include those that commenced construction, modification, or reconstruction after the date of proposal. The standard sets initial notification, initial performance test, and ongoing recordkeeping requirements. The required monthly leak detection records are used to determine periods of excess emissions, identify problems at the facility, verify operation/maintenance procedures and for compliance determinations. This information is collected to assure compliance with 40 CFR CFR Part 60, Subpart XX.
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.