Document
Appendix K
ICR 201211-2060-005 · OMB 2060-0629 · Object 36365701.
⚠️ Notice: This form may be outdated. More recent filings and information on OMB 2060-0629 can be found here:
Document [pdf]
Download: pdf | txt
Appendix K1 Detailed Unit Burden and Cost for Injection and Geologic Sequestration of Carbon Dioxide (Subpart RR) (Does Not Include Burden Cost for Exemption Requests) Annual Burden & Cost Per Facility, Subpart RR ICR Activity Estimation of Fugitive Emission from Surface Facilities Periodic Digital Color Infrared Orthoimagery (CIR) or Hyperspectral Imaging to detect changes to vegetation. Periodic mobile survey to detect surface leaks. May be good option where vegetation is sparse. Soil zone monitoring (sampling gas from accumulation chambers) Vadose zone monitoring wells to sample gas above water table. Monitoring wells for samples from water table. Cost of Episodic Surveys to Quantify Leaks MRV Monitoring Reporting and Recodkeeping Sub Categories/Notes Total Labor Cost ($) Responses/ Respondent Total Responses Total Burden (hrs) Planning and initial inventory 1 1 40 $ 5,957 $ $ $ 5,957 Annual calculations 1 1 24 $ 3,574 $ $ $ 3,574 Planning and QA 0.5 0.5 0 $ $ $ 48,000 $ 48,000 Mobilization 0.5 0.5 0 $ $ $ 3,000 $ 3,000 Airborne Survey 0.5 0.5 0 $ $ $ 30,000 $ 30,000 Planning and QA 0.5 0.5 0 $ $ $ 48,000 $ 48,000 Mobilization 0.5 0.5 0 $ $ $ 3,000 $ 3,000 Airborne Survey 0.5 0.5 0 $ $ $ 11,520 $ 11,520 Monitoring plan 1 1 40 $ 5,957 $ 4,321 $ $ 10,277 Sampling and Analysis 1 1 0 $ $ $ 2,880 $ 2,880 Monitoring plan 1 1 40 $ 5,957 $ 5,761 $ $ 11,718 Sampling and Analysis 1 1 0 $ $ $ 2,880 $ 2,880 Monitoring plan 1 1 40 $ 5,957 $ 57,607 $ $ 63,564 Sampling and Analysis 1 1 0 $ $ $ 11,520 $ 11,520 0.01 0.01 2 $ 189 $ $ $ 189 0.01 0.01 2 $ 189 $ $ 473 $ 662 0.01 0.01 3 $ 378 $ $ $ 378 0.01 0.01 2 $ 189 $ $ 1,248 $ 1,437 0.01 0.01 1 $ 414 $ $ 840 $ 1,254 Evaluate Leakage Pathways 1 1 16 $ 1,253 $ $ $ 1,253 Delineate Areas of Monitoring Develop strategy for leak detection, verification and 1 1 32 $ 2,505 $ $ $ 2,505 1 1 160 $ 12,526 $ $ $ 12,526 Establish baseline conditions 1 1 16 $ 1,253 $ $ $ 1,253 Tailor mass balance equation 1 1 8 $ 626 $ $ $ 626 Write MRV plan Discuss MRV plan with EPA and edits 1 1 400 $ 31,316 $ $ $ 31,316 1 1 100 $ 7,829 $ $ $ 7,829 Annual Report CO2 Flow Meter Data Collection 1 1 100 $ 7,829 $ $ $ 7,829 1 1 4 $ 332 $ $ $ 332 Reporting 1 1 23 $ 1,700 $ $ $ 1,700 Recordkeeping 1 1 7 $ 500 $ $ $ 500 Totals 22 22 1,059 $ 96,429 $ 67,688 $ 163,361 $ 327,478 Surface leak detected by air, soil or water table monitoring or subsurface leak detected by pressure anomaly etc. (material balance). Surface leak detected by MIT survey or by air, soil or water table monitoring (well logs). pressure anomaly in containment zone (pressure readings). soil or water table monitoring (seismic). soil or water table monitoring (tenting). Capital Cost ($) O&M Cost ($) Total Cost ($) Appendix K1 Detailed Unit Burden and Cost for Injection and Geologic Sequestration of Carbon Dioxide (Subpart UU) Annual Burden & Cost Per Facility, Subpart UU ICR Activity Monitoring Reporting and Recodkeeping Sub Categories/Notes Total Labor Cost ($) Responses/ Respondent Total Responses Total Burden (hrs) Injectate Sampling and Analysis 4 4 10 $ 630 $ $ 2,256 $ 2,886 Reporting 1 1 24 $ 1,700 $ $ $ 1,700 Recordkeeping 1 1 7 $ 500 $ $ $ 500 Totals 6 6 41 $ 2,830 $ $ 2,256 $ 5,086 Capital Cost ($) O&M Cost ($) Total Cost ($) Appendix K-2 Summary of Burden and Cost for Injection and Geologic Sequestration of Carbon Dioxide (Subparts RR and UU)* Year 1 Source Category No. Respondents Responses/ Respondent Total Responses Total Burden (hrs) Total Labor Cost ($) Capital Cost ($) Subpart RR 1 Varies 22 1,059 $ 96,429 $ Subpart UU 91 Varies 546 3,702 $ 257,565 $ Exemption requests (Subpart RR) 1 1 1 16 $ 1,097 Total 93 Varies 569 4,777 $ 355,090 $ 67,688 67,688 O&M Cost ($) Total Cost ($) $ 163,361 $ 327,478 $ 205,296 $ 462,861 $ 1,097 $ 791,436 $ 368,657 Year 2 Source Category No. Respondents Responses/ Respondent Total Responses Total Burden (hrs) Total Labor Cost ($) Capital Cost ($) O&M Cost ($) Total Cost ($) Subpart RR 2 Varies 44 2,118 $ 192,858 $ $ 326,722 $ 654,956 Subpart UU 92 Varies 552 3,743 $ 260,395 $ $ 207,552 $ 467,947 Exemption requests (Subpart RR) 1 1 1 16 $ 1,097 $ $ $ 1,097 Total 95 0 597 5,877 $ 454,350 $ $ 1,124,000 No. Respondents Responses/ Respondent Total Responses Total Burden (hrs) Subpart RR 3 Varies 66 3,177 Subpart UU 93 0 558 Exemption requests (Subpart RR) 1 1 1 Total 97 0 625 No. Respondents Responses/ Respondent Total Responses Total Burden (hrs) 135,376 135,376 $ 534,274 Year 3 Source Category Total Labor Cost ($) Capital Cost ($) $ 289,287 $ 3,783 $ 263,225 16 $ 1,097 6,977 $ 553,609 $ 203,065 O&M Cost ($) $ 490,083 $ $ 209,808 $ $ 203,065 $ 699,891 Total Cost ($) $ 982,435 $ 473,033 $ 1,097 $ 1,456,565 Annual Average 3 year ICR Period Source Category Total Labor Cost ($) Capital Cost ($) O&M Cost ($) Total Cost ($) Subpart RR 2 Varies 44 2,118 $ 192,858 $ $ 326,722 $ 654,956 Subpart UU 92 Varies 552 3,743 $ 260,395 $ $ 207,552 $ 467,947 Exemption requests (Subpart RR) 1 1 1 16 $ 1,097 $ $ $ 1,097 $ 1,124,000 Total 95 0 597 5,877 $ 454,350 $ * Does not include the provision of information on parent companies, NAICS codes, and whether emissions are from cogeneration. 135,376 135,376 $ 534,274 Appendix K-3 Subpart RR - Summary of Cost and Burden Non-Federal Respondents Source Category No. Respondents Subpart RR Subpart UU 2 87 Total 89 Current Inventory (OMB No. 2060 0649, ICR No. 2372.02, 2372,03) Total Labor Responses/ Total Total Burden Capital Cost O&M Cost Cost Respondent Responses (hrs) ($) ($) ($K) 16 32 1,234 $ 133 $ 88 $ 244 6 520 3,560 $ 224 $ $ 196 22 552 4,794 $ 357 $ 88 $ Total Cost ($) $ $ 465 420 439 $ 884 Revised Inventory Source Category Total Labor Cost ($K) No. Respondents Responses/ Respondent Total Responses Total Burden (hrs) Subpart RR Subpart UU 3 92 Varies Varies 45 552 2,134 3,743 $ $ 194 260 Total 95 0 597 5,877 $ 454 $ Source Category No. Respondents Responses/ Respondent Total Responses Subpart RR Subpart UU 1 5 Varies Varies 13 32 Total 6 45 Capital Cost ($) O&M Cost ($) Total Cost ($) $ $ $ $ $ $ 656 468 534 $ 1,124 135 135 $ 327 208 Difference Total Labor Capital Cost O&M Cost Total Burden Cost ($) ($) (hrs) ($) 900 $ 61 $ 47 $ 83 183 $ 36 $ $ 12 1,083 $ 97 $ 47 $ Total Cost ($) $ $ 192 48 95 $ 240 Reason for Change in Burden (see Appendix K 3 for more details): • Shifted the activities associated with Subpart RR two years into the future to reflect the fact that Class VI UIC permits were not issued as quickly as anticipated in the ICR. For example, the activities estimated for Year 1 of the current ICR (2011) have been shifted to Year 1 of the renewal ICR (2013, the first year in which Class VI injection is expected to begin). • Adjusted the labor hours, labor cost, O&M costs, and capital cost per facility for Subpart UU to recognize the completion of the one time activities that occurred in the first year of data collection (2011). • Adjusted the number of respondents for Subpart UU to reflect the slightly higher number of facilities anticipated in the out years of the previous ICR.
| File Type | application/pdf |
| File Title | K cover |
| Author | Patty Hertzler |
| File Modified | 2012-09-17 |
| File Created | 2012-09-17 |