Document
HUD-424-CB Grant Application Detailed Budget
ICR 200703-2502-001 · OMB 2502-0261 · Object 1998201.
⚠️ Notice: This form may be outdated. More recent filings and information on OMB 2502-0261 can be found here:
Document [xls]
Download: xls | pdf | html
Sheet4
Overview
Sheet1Sheet4
Sheet 1: Sheet1
| Grant Application Detailed Budget | U.S. Department of Housing and Urban Development | OMB Approval No. 2501-0017 (exp. 01/31/2008) | ||||||||||
| Functional Categories [Year 1:__] [Year 2:__] [Year 3:__] [All Years:__] | ||||||||||||
| Name of Project/Activity: | Column 1 | Column 2 | Column 3 | Column 4 | Column 5 | Column 6 | Column 7 | Column 8 | Column 9 | |||
| HUD Share | Applicant Match | Other HUD Funds | Other Fed Share | State Share | Local/Tribal Share | Other | Program Income | Total | ||||
| a. Personnel (Direct Labor) | $ | $ | $ | $ | $ | $ | $ | $ | $ | |||
| b. Fringe Benefits | ||||||||||||
| c. Travel | ||||||||||||
| d. Equipment (only items > $5,000 depreciated value) | ||||||||||||
| e. Supplies (only items w/depreciated Value < $5,000 ) | ||||||||||||
| f. Contractual | ||||||||||||
| g. Construction | ||||||||||||
| 1. Administration and legal expenses | ||||||||||||
| 2. Land, structures, rights-of way, appraisals, etc. | ||||||||||||
| 3. Relocation expenses and payments | ||||||||||||
| 4. Architectural and engineering fees | ||||||||||||
| 5. Other architectural and engineering fees | ||||||||||||
| 6. Project inspection fees | ||||||||||||
| 7. Site work | ||||||||||||
| 8. Demolition and removal | ||||||||||||
| 9. Construction | ||||||||||||
| 10. Equipment | ||||||||||||
| 11. Contingencies | ||||||||||||
| 12. Miscellaneous | ||||||||||||
| h. Other (Direct Costs) | ||||||||||||
| i. Subtotal of Direct Costs | ||||||||||||
| j. Indirect Costs (% Approved Indirect Cost Rate:___%) | ||||||||||||
| Grand Total (Year:___): | ||||||||||||
| Grand Total (All Years): |
Sheet 2: Sheet4
| Instructions for the HUD Grant Application Detailed Budget Form | ||||||||||||||
| Public reporting burden for this collection of information is estimated to average 2 hours 36 minutes per response, including the time for reviewing instructions, searching existing data | ||||||||||||||
| sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. This agency may not collect this information, and you are not required to | ||||||||||||||
| complete this form, unless it displays a currently valid OMB control number. Information collected will provide proposed budget data for multiple programs. HUD will use this information | ||||||||||||||
| in the selection of applicants. Response to this request for information is required in order to receive the benefits to be derived. The information requested does not lend itself to | ||||||||||||||
| confidentiality. | ||||||||||||||
| General Instructions | ||||||||||||||
| This form is designed so that an application can be made for any of HUD's grant programs. Separate sheets | Line h.--Enter any other direct costs not already addressed above. | |||||||||||||
| must be used for each proposed program year and for a summary of all years. | Line i.--Calculate the totals of all applicable columns to determine the Subtotal of Direct Costs. | |||||||||||||
| Check applicable program year or all years box at top of page to indicate which applies. | Line j.--Indicate the approved Indirect Cost Rate (if any) and calculate the indirect cost in accordance with | |||||||||||||
| On the final sheet enter the Grand Total for all years in the applicable box at the | the terms of your approved indirect cost rate and enter the resulting amount. | |||||||||||||
| bottom of the page. In preparing the budget, adhere to any existing HUD requirements which | Grand Total (Year:__)--Enter the sum of lines i. and j. under column 9 for each year, and enter the | |||||||||||||
| prescribe how and whether budgeted amounts should be separately shown for different functions or | applicable year, in the blank, for each sheet completed. | |||||||||||||
| activities within the program. For some programs, HUD may require budgets to be shown separately by | Grand Total (All Years)--Enter the sum of all the, "Grand Total (Year:__)" amounts from each sheet | |||||||||||||
| function or activity. Your budget information should show the entire cost of your proposed program of | completed, under column 9, for all proposed years. | |||||||||||||
| activities per year. If you are not using funds in any of the line item categories, you should leave the item | ||||||||||||||
| blank. Pages may be duplicated to show budget data for individual programs, projects or activities. | For each budget category (personnel, fringe benefits, travel, etc) you should identify the amount of funding | |||||||||||||
| you plan on using in your grant program. You should complete each column as follows: | ||||||||||||||
| NOTE: Not all budget categories on this form are eligible for funding under all programs. | ||||||||||||||
| Please see eligible activities under the specific program for which you are seeking | Column 1 - Identify the amount of funds that you will need from the HUD grant program for | |||||||||||||
| funding. | which you are seeking funding. | |||||||||||||
| Budget Categories | Column 2 - Identify any matching funds that you are required to include in your proposed | |||||||||||||
| The budget categories identifies how your program funds will be allocated by type of | program in order to be eligible for assistance. | |||||||||||||
| use, e.g., funds going for salaries, travel, contracts, etc. Each of these line items should | Column 3 - Identify any other HUD funds that you will be adding to this program either | |||||||||||||
| be broken out under each applicable column. | through your formula or competitive grant programs. | |||||||||||||
| Lines a-f--Show the totals of Lines a to f in each column. | Column 4 - Identify any other Federal funds that you will be adding to this program either | |||||||||||||
| Lines g. Show construction related expenses in the appropriate categories below. | through your formula or competitive grant programs. | |||||||||||||
| Line g.1.--Enter estimated amounts needed to cover administrative expenses. Do not include costs which | Column 5 - Identify any State funds that you will be adding to this program. | |||||||||||||
| are related to the normal functions of government. | Column 6 - Identify any Local or Tribal Government funds that you will be adding to this | |||||||||||||
| Line g.2.--Enter estimated site and right(s)-of-way acquisition costs (this includes purchase, lease, | program. | |||||||||||||
| and/or easements). | Column 7 - Identify any additional funds not previously identified in Columns 1 - 6, that | |||||||||||||
| Line g.3.--Enter estimated costs related to relocation advisory assistance, | you intend to use for your proposed program. | |||||||||||||
| replacement housing, relocation payments to displaced persons and businesses, etc. | Column 8 - Identify any program income that you expect to generate under this program. | |||||||||||||
| Line g.4.--Enter estimated basic engineering fees related to construction | Column 9 - | Add columns 1 - 8 across and place the total in Column 9. | ||||||||||||
| (this includes start-up services and preparation of project performance work plan). | ||||||||||||||
| Line g.5.--Enter estimated engineering costs, such as surveys, tests, soil borings, etc. | ||||||||||||||
| Line g.6.--Enter estimated engineering inspection costs. | ||||||||||||||
| Line g.7.--Enter the estimated site preparation and restoration which are not | ||||||||||||||
| included in the basic construction contract. | ||||||||||||||
| Line g.8.--Enter the estimated costs related to demolition activities. | ||||||||||||||
| Line g.9.--Enter estimated costs of the construction contract. | ||||||||||||||
| Line g.10.--Enter estimated cost of office, shop, laboratory, safety equipment, | ||||||||||||||
| etc. to be used at the facility, if such costs are not included in the construction contract. | ||||||||||||||
| Line g.11.--Enter any estimated contingency costs. | ||||||||||||||
| Line g.12.--Enter estimated miscellaneous costs. |
| File Type | application/vnd.ms-excel |
| File Title | HUD-424-CB Grant Application Detailed Budget |
| Author | Eric C. Gauff |
| Last Modified By | HUD |
| File Modified | 2007-01-16 |
| File Created | 2001-12-11 |