Document
Form C-700 Construction Project Report - Private Construction Proje
ICR 200702-0607-007 · OMB 0607-0153 · Object 1897001.
⚠️ Notice: This form may be outdated. More recent filings and information on OMB 0607-0153 can be found here:
Document [pdf]
Download: pdf | txt
▲▲ C-700 U.S. DEPARTMENT OF COMMERCE FORM (1-12-2004) Economics and Statistics Administration CONSTRUCTION PROJECT REPORT OMB No. 0607-0153: Approval Expires 04/30/2007 NOTICE – Your report to the Census Bureau is confidential by law (title 13, U.S. Code). It may be seen only by persons sworn to uphold the confidentiality of Census Bureau information and may be used only for statistical purposes. The law also provides that copies retained in your files are immune from legal process. In any correspondence pertaining to this report, refer to the control number shown below. PRIVATE CONSTRUCTION PROJECTS IMPORTANT Please refer to the Reporting Instructions on the back of the form. DUE DATE: FAX U.S. Census Bureau 1201 East 10th Street Jeffersonville, IN 47132-0001 1–800–845–8245 Section A PROJECT IDENTIFICATION RETURN FORM TO (Please correct any error in name and address including ZIP Code, telephone and fax number) The construction project described below is associated with your organization according to published sources. Please correct any errors or fill in any blanks in items 1 and 2. If necessary, make your corrections in item 11, Remarks, or use a separate sheet. IF YOU HAVE ANY QUESTIONS CONCERNING THIS FORM, PLEASE CALL 1–800–845–8246. 1. PROJECT DESCRIPTION Section D SQUARE FEET 8. Based on exterior dimensions, how many square feet of enclosed floor area (including basements) will be created by this project? Exclude nonbuilding projects Square feet and existing floor space that is being remodeled. If none, enter "0." Section E This form will be returned to you EACH MONTH until the project is completed. 2. PROJECT LOCATION Section B OWNERSHIP AND START DATE 3. TYPE OF OWNERSHIP – Mark (X) one box. Will this project be privately or government owned during construction? Privately owned Government owned 4. START DATE OF CONSTRUCTION When did actual construction work on the site start, or when do you estimate it will start? Enter month and year. Section C MONTHLY CONSTRUCTION PROGRESS REPORT Month and year of actual or expected start date • Continue with item 9 if project has started; otherwise, skip to section F. • Report the value of construction put in place each month. Include only those construction costs defined in item 5c. DO NOT include costs reported in items 6 and 7. • Report costs in the month in which work was done (including any monthly retainage being withheld from contractors) rather than in the month in which payment was made. • When project is completed, enter month and year in item 10. 9. MONTHLY VALUE OF CONSTRUCTION PUT IN PLACE ON PROJECT DESCRIBED IN ITEM 1 Month and year report period COST ESTIMATES INCLUDE • Site preparation and outside construction such as sidewalks and roadways • Mechanical and electrical installations which are integral parts of the structure, such as elevators, heating equipment, etc. (a) EXCLUDE • Land and pre-existing structures • Architectural, engineering, and owner’s overhead and miscellaneous costs – See item 6 • Furniture, furnishings, and other movable equipment – See item 7 • Contingency funds FOR INDUSTRIAL STRUCTURES SEE SPECIAL INSTRUCTIONS ON BACK NOTE: If project is on a "cost plus" basis, enter your best estimate of the final cost. Construction costs 5a. CONTRACT CONSTRUCTION COST (Thousands of dollars) (Amounts to be paid to contractors and subcontractors) $ ,000.00 5b. OWNER SUPPLIED MATERIALS AND LABOR (Construction materials supplied by owner and the value of work done by project owner’s own construction employees assigned to the project.) 5c. TOTAL CONSTRUCTION COST (Sum of 5a + 5b) ,000.00 $ ,000.00 $ ,000.00 $ ,000.00 $ ,000.00 $ ,000.00 $ ,000.00 ,000.00 $ ,000.00 $ ,000.00 $ ,000.00 $ ,000.00 $ ,000.00 $ ,000.00 $ ,000.00 INCLUDE • All fees for architectural and engineering services except fees for designing production machinery and equipment. If contractor was authorized to "design and construct" this project, such cost should be included in item 5a. • Cost of design work by owner’s staff • Project owner’s overhead and office costs • Interest and taxes to be paid during construction Architectural, engineering, • Fees and other miscellaneous costs and miscellaneous costs allocated on owner’s books to this project (Thousands of dollars) EXCLUDE • Cost of production machinery and equipment, land, and furniture and furnishings – See item 7 $ ,000.00 INCLUDE • Production machinery and equipment, furniture and office equipment. EXCLUDE • Expenditures for land $ $ 6. ARCHITECTURAL, ENGINEERING, AND MISCELLANEOUS COSTS 7. ESTIMATED AMOUNT OF ALL OTHER CAPITAL EXPENDITURES Value of construction put in place during month as defined in item 5c (Thousands of dollars) (b) Other capital expenditures 10. COMPLETION DATE (Thousands of dollars) $ ,000.00 Enter date when all construction is actually completed Month and year of completion NOTE: Be sure to complete section F on the reverse side. REPORTING INSTRUCTIONS FOR PRIVATE CONSTRUCTION PROJECTS ▲ Section A – PROJECT IDENTIFICATION Item 5a – Estimate the total amount to be paid to construction contractors by the project owner for work done on this project. Correct any information in items 1 and 2 if necessary. For the project described in item 1 to be privately owned, it must be privately owned during construction and involve the erection of a new structure(s) or improvements to an existing structure(s) as defined below. Item 5b – Estimate the total cost of labor by the owner’s construction employees working on the project, including supervisory personnel assigned to the project. Include the total cost of all construction materials supplied by the owner, including those the owner expects to supply to the contractor for installation in this project. For the project described in item 1 to be government owned, it must be State or local government owned during construction and involve the erection of a new structure(s) or improvements to an existing structure(s) as defined below. Item 5c – Sum of values reported in items 5a and 5b. This is the value to be reported in item 9, monthly value of construction put in place. If the project is only maintenance and repairs, please note so in item 11, Remarks, complete item 12, and return the form. ▲ Item 6 – Estimate the total amount of fees which the project owner has paid or will pay to architectural and engineering firms for work on this project. Also estimate the total cost of all other construction items which the project owner will allocate on his books to this project. Include the project owner’s overhead and office costs, interest and taxes paid during construction, the cost of design work by the owner’s staff, and other miscellaneous construction fees and costs allocated on the owner’s books. DO NOT include the cost of production machinery and equipment, land, and furniture and furnishings. Section B – OWNERSHIP AND START DATE Item 3 – As noted, "ownership" for purposes of this survey depends on the owner during the construction phase. Check the appropriate box. Item 4 – The start date is defined as the date that actual construction work first began on the project described in item 1. If the project is to start at some future date, please enter the date, complete item 12, and return the form. ▲ Item 7 – Estimate the total amount of all capital expenditures, which you expect to make on this project, not reported in items 5a, 5b, 5c, and 6. Include production machinery and equipment, furniture, office equipment and other movable equipment. Section C – COST ESTIMATES "Construction," for purposes of this survey, is defined as the building of and/or improvements to fixed structures. This INCLUDES: ▲ a. New structures, additions, alterations, conversions, expansions, rebuilding, reconstruction, renovations, rehabilitations and major replacements (such as the complete replacement of a roof or heating system). Item 9 – Report the monthly value of construction put in place for the costs associated with item 5c. These costs include: a. Work done by contractors and/or subcontractors, including any retainage being withheld until the work is complete. b. Mechanical and electrical installations – Plumbing, heating, electrical work, elevators, escalators, central air-conditioning, and other similar building services. c. Outside construction – Clearing and grading of undeveloped land and the fixed, auxiliary structures which the project owner builds within the property lines. Also roadways, bridges, parking lots, utility connections, outdoor lighting, pools, athletic fields, piers, wharves and docks, and all similar auxiliary facilities. b. The cost of any materials installed which were provided by the owner. c. The work done by the project owner’s own construction employees, including supervisory personnel assigned to this project. Initially, report monthly values from the start month to the most current month shown in item 9. Then each month, when the form is returned to you, report for the month shown and any revisions which you might have. When entering monthly data, be sure to report the costs in the month in which the work was done rather than in the month in which payment was made. FOR INDUSTRIAL STRUCTURES In addition to a, b, and c, construction INCLUDES: d. Fixed, largely site-fabricated equipment which is not housed in a building, primarily for petroleum refineries and chemical plants, but also including storage tanks, refrigeration systems, etc. If the contractor’s bills are for periods other than monthly, estimate a monthly amount. In each month where there is no construction, enter a zero. e. The cost and installation of construction materials placed inside an industrial building and used to support production machinery, for example: concrete platforms, overhead steel girders, and pipes to carry paint, etc. from storage tanks. Item 10 – If construction is complete except for some minor work (up to 3 percent of item 5c), you may stop reporting on this project by indicating in item 11, Remarks, and entering the completion date in item 10. f. The following types of equipment: boilers, overhead hoists and cranes, and blast furnaces. ▲ EXCLUDE: The cost and installation of production machinery not listed above, such as industrial robots, stamping machinery, printing presses, bottling machines, packaging equipment, generators, compressors, motors, computer systems, etc. See item 7. Section E – MONTHLY CONSTRUCTION PROGRESS REPORT Section F – PERSON TO CONTACT REGARDING THIS REPORT Item 12 – Enter the name, title, address, telephone and fax number of the person who can answer questions about this report. 11. REMARKS Section F 12a. Name PERSON TO CONTACT REGARDING THIS REPORT – Please print or type b. Title c. Telephone Area code Number d. Organization e. Address f. Fax Area code Number FORM C-700 (1-12-2004) Extension
| File Type | application/pdf |
| File Title | Form C-700 Construction Project Report - Private Construction Proje |
| File Modified | 2007-01-22 |
| File Created | 2004-01-15 |